Risks and progress
Maintenance windows
How to change parts that need a shutdown without hurting customers: scheduling a window, hot and cold swap, and what a forced shutdown costs.
Some parts can be changed while a server runs; others need it switched off. A maintenance window lets you switch it off without it counting against you.
Hot and cold swap
- Hot swap: disks in drive bays, power supplies and blade bays. Change them while the server runs. On a server with customers, a power supply can come out only if the others carry the load, and a disk only if its array has redundancy to spare.
- Cold swap: processors, memory, M.2 disks and expansion cards. The server must be powered down: on a running server the game refuses to fit or pull them. Force a shutdown or open a maintenance window first.
The one exception is a stolen part: it is not physically there, so its record can be cleared from a running server at any time. Fitting the replacement still follows the rules above.
The Maintenance page marks every part hot or cold.
Scheduling a window
- On Maintenance, under Schedule maintenance, pick the Server.
- Pick when it Starts: at least a day from now, so customers are warned.
- Pick the Duration.
- Click Schedule window.
The server's Nodes page then shows the next window: the game month and hour it opens, and how long until then. The bar at the top shows the current month and time of day. Upcoming windows lists all of them; you can Cancel one before it starts.
During the window
When the window opens, click Start maintenance (on Maintenance or the server's Nodes page). The server shuts down, and you can swap any part safely. Finish window (or Finish maintenance) powers it back on; otherwise it comes back when the window ends.
During a window customers are not penalised, keep paying, and the time does not count as downtime.
Without a window
Force shutdown switches a server off at once. Customers lose service, it counts as downtime and costs reputation, and some customers may leave. Use it only when something is truly urgent.
Tip: Plan a window as soon as Maintenance shows a cold-swap part getting worn. A week of warning is better than one failed part at peak hour.
Common mistakes
- Planning a memory upgrade without a window: the game will not let you swap memory on a running server.
- Forcing a shutdown when a window a day later would have done.
- Forgetting that a server with no customers needs no window at all.
Want the numbers? The full rules: Building servers