Your datacenter
Power and cooling
Power and heat in a cabinet: included power, overage, the breaker, power strips, UPS, A and B feeds, redundant supplies, cooling units and temperature.
Every watt your hardware draws is paid for and turns into heat. Get power and cooling wrong and you see it on your bill, in parts that fail sooner, and in outages you could have ridden through.
How much you draw
A server draws more the busier it is: an idle server uses part of its full draw, a full one all of it. Switches, firewalls, UPS units and coolers draw a fixed amount. The Power box shows the cabinet's draw now against what is included.
Efficient power supplies (Gold, Platinum, Titanium) waste less, so the same server costs less to run.
Included power and overage
Each rented unit includes some power. Draw above it is billed by the hour. That is fine for a while, but watch the next limit.
The breaker
Every cabinet has a breaker. Draw far over the included power and it trips: the whole cabinet goes dark for a while. The Power box shows where the breaker trips and how close you are. Since busy servers draw more, a cabinet that is fine in the morning can trip in the evening rush.
Power strips (PDUs) help:
- The landlord's strip gives no readout: the breaker just trips.
- A basic PDU adds outlets, nothing more.
- A metered PDU warns you before the breaker trips.
- A switched PDU switches off the newest server instead of letting the whole cabinet go dark.
Power events
- Power sags: brief dips that reboot unprotected servers. Only reach your rack in Unrated buildings; rated buildings have their own UPS. A rack UPS rated above the cabinet's draw, or a B-feed, rides them out.
- Feed drops: the cabinet's power line goes down for hours. A B-feed (a second power line, for extra rent) keeps servers up, but only those with two power supplies, each strong enough to carry the server alone. A transfer switch (ATS) moves single-supply gear onto the B-feed.
- Grid outages: the whole building loses power. Only the building's generators help (see Datacenter tiers); a rack UPS is not a generator.
Heat and cooling
The building cools as much heat as the power your units include, so most cabinets never need more. The Cooling box shows the inlet temperature and heat against cooling:
- OK: within the cabinet's cooling.
- Warm: above it. Parts fail sooner.
- Overheating: well above it. Parts fail much sooner, and smoke alarms become more likely.
A rack cooling unit adds cooling, but only helps once the heat is above what the cabinet already handles; until then the Cooling box says it has nothing to do. Expanding the cabinet also helps: each unit brings more power and cooling. An environment sensor warns before the cabinet gets warm and gives you more time to answer a smoke alarm.
Common mistakes
- Mounting one more server and tripping the breaker at peak hour.
- Paying for a B-feed with single-supply servers: they still go dark.
- Buying a cooling unit for a cabinet that is not warm.